EIA: Xi’an Urban Road Network Improvement Project

Published Date: 
05/2011

The environmental impact assessment (EIA) for the Project is prepared by the PPTA consultants on behalf of the Xian Municipal Government (XMG) on the basis of the following documents: (i) feasibility study reports of five project sub-components, (ii) the government project environmental impact assessment report (the government EIA), and (iii) cultural relic survey report. The PPTA team has prepared an English language EIA based on these documents, and which comply with the requirements of ADB’s Environmental Assessment Guidelines (2003) and ADB’s Safeguard Policy Statement (2009). An outline of the main findings of the EIA is presented here.

AttachmentSize
china_xian_urbanroadnetwork_draft2011.pdf4.4 MB
Tags: